48 MW Jagran II Hydropower project
- Client / EPC: FWO – HMC – BITC – CNTIC JV
- Owner: Power Development Organization (PDO), Azad Jammu & Kashmir (AJK)
- Location: Jagran River near Athmuqam, Neeleum Valley, AJK
- Capacity: 48 MW
- Design Discharge: 22.5 Cumecs
- Net Head: 168 meter
- Total Annual Energy: 162.24 GWh
- Services Provided/ Scope of Work
- Assistance to EPC Contractor during Bidding
- Detailed Topographic Surveying
- Detailed Geotechnical & Geophysical Investigations
- Construction of pre engineered steel buildings
- Manufacturing & supply of steel lining for tunnels
- Technical Assistance to EPC Contractor
- Status: Completed
Packages Power Kasur Hydropower project 2.4MW
- Client / Developer: Packages Power (Pvt.) Ltd.
- Owner: Punjab Power Development Board (PPDB) / Punjab Energy Department, Government of Punjab
- Location: BRBD Link Canal RD 510+600, Kasur
- Capacity: 2.45 MW
- Design Discharge: 50 Cumecs
- Net Head: 5.77 meter
- Plant Factor: 50.02 %
- Total Annual Energy: 10.73 GWH
- Services Provided/ Scope of Work
- Detailed Feasibility Study
- Initial Environmental Examination
- Technical Assistance to Client
- Milestones Achieved: Approval of Feasibility Study
- Approval of IEE
- Approval of Interconnection Study
- Status: Completed
Ravi Hydropower Project
- Client / Developer: Trident Power JB (Pvt.) Ltd.
- Owner: Punjab Power Development Board (PPDB) / Punjab Energy Department, Government of Punjab
- Capacity: 4.6 MW
- Location: Lower Bari Doab Canal (LBDC) RD 160+000, Okara Cantt
- Design Discharge: 170 Cumecs
- Net Head: 3.2 meter
- Plant Factor: 68.20 %
- Total Annual Energy: 27.2 GWH
- Services Provided: Project Inception to Completion
- Detailed Feasibility Study
- Initial Environmental Examination
- Acquisition of Power Generation License
- Tariff Approval
- EPC Bidding
- Assistance in land Acquisition
- Assistance in Financial Closure
- Milestones Achieved: Approval of Feasibility Study
- Approval of IEE
- Approval of Interconnection Study
- Acquisition of Power Generation Licensing
- Tariff Approval
- EPC Bidding
LCC Hydropower Project
- Client / Developer: Trident Power GR (Pvt.) Ltd.
- Owner: Punjab Power Development Board (PPDB) / Punjab Energy Department, Government of Punjab
- Capacity: 7.55 MW
- Location: Lower Chenab Canal (LCC) RD 1+500, Gujranwala
- Design Discharge: 250 Cumecs
- Net Head: 3.5 meter
- Plant Factor: 66.53 %
- Total Annual Energy: 43.71 GWH
- Services Provided: Project Inception to Completion
- Detailed Feasibility Study
- Initial Environmental Examination
- Acquisition of Power Generation License
- Tariff Approval
- EPC Bidding
- Assistance in land Acquisition
- Assistance in Financial Closure
- Milestones Achieved: Approval of Feasibility Study
- Approval of IEE
- Approval of Interconnection Study
- Acquisition of Power Generation Licensing
- Tariff Approval
- EPC Bidding
Kathai II Hydropower Project
- Client / Developer: Kathai II Hydro (Pvt.) Ltd.
- Owner: Power Development Organization (PDO), Azad Jammu & Kashmir (AJK)
- Capacity: 8 MW
- Location: Kathai Nala, Chinari, AJK
- Design Discharge: 06 Cumecs
- Net Head: 160 meter
- Plant Factor: ~ 66.53
- Total Annual Energy: 43.61 GWH
- Services Provided:
- Updated & Detailed Feasibility Study
- Initial Environmental Examination
- Technical Assistance to Client
- Milestones Achieved: Approval of Feasibility Study
- Approval of IEE
- Approval of Interconnection Study
Khanewal Hydropower Project
- Client / Developer: Noor Power (Pvt.) Ltd.
- Owner: Punjab Power Development Board (PPDB) / Punjab Energy Department, Government of Punjab
- Capacity: 1 MW
- Location: Lower Bari Doab Canal (LBDC) RD 602+800, Khanewal
- Design Discharge: 40 Cumecs
- Net Head: 2.9 meter
- Plant Factor: 69.20 %
- Total Annual Energy: 6.02 GWH
- Services Provided:
- Detailed Feasibility Study
- Initial Environmental Examination
- Technical Assistance to Client
- Milestones Achieved: Approval of Feasibility Study
- Approval of IEE
- Stats: Completed
Chichawatni Hydropower project
- Client / Developer: Saigols Group of Companies (Pvt.) Ltd.
- Owner: Punjab Power Development Board (PPDB) / Punjab Energy Department, Government of Punjab
- Capacity: 1.6 MW
- Location: Lower Bari Doab Canal (LBDC) RD 495+690, Chichawatni
- Design Discharge: 75 Cumecs
- Net Head: 2.4 meter
- Plant Factor: 88 %
- Total Annual Energy: 12.04 GWH
- Services Provided:
- Detailed Feasibility Study
- Initial Environmental Examination
- Technical Assistance to Client
- Milestones Achieved: Approval of Feasibility Study
- Approval of IEE
- Status: Completed
Khushab Hydropower
- Client: Directorate of Power Projects (DOPP), Punjab Energy Department Government of Punjab
- Owner: Punjab Energy Department, Government of Punjab
- Capacity: 468 KW
- Location: Link Channel, Muhajir Branch, Khushab
- Design Discharge: 480 Cusecs
- Net Head: 4.1 meter
- Plant Factor: 66.59 %
- Total Annual Energy: 2730 MWH
- Services Provided: EPC Bidding & Evaluation
- Technical Assistance to Client
- Status: Completed
Nandipur Hydropower
- Client: Directorate of Power Projects (DOPP), Punjab Energy Department Government of Punjab
- Owner: Punjab Energy Department, Government of Punjab
- Capacity: Powerhouse 1: 102 KW; Powerhouse 2: 277 KW
- Location: IRI Nandipur, Upper Chenab Canal (UCC),
- Design Discharge: Power House 1: 200 Cusecs; Power House 2: 400 Cusecs
- Net Head: Powerhouse 1: 2.43 meter; Powerhouse 2: 3.35 meter
- Services Provided:
- EPC Bidding & Evaluation
- Technical Assistance to Client
- Status: Completed
Majuhaan Chalissian Hydropower project
- Client / Developer: Private Sector
- Capacity: 2.5 MW
- Design Discharge: 01 Cumecs
- Net Head: 305 meter
- Plant Factor: 60.1%
- Total Annual Energy: .13.4 GWH
- Services Provided: Site identification & inception studies
Lohkan Hydropower Project
- Client / Developer: Private Sector
- Capacity: 09 MW
- Design Discharge: 30 Cumecs
- Net Head: 40 meter
- Plant Factor: 62.5%
- Total Annual Energy: 49.7 GWH
- Services Provided: Site identification & inception studies
Salol Hydropower Project
- Client / Developer: Private Sector
- Capacity: 12 MW
- Design Discharge: 290 Cumecs
- Net Head: meter
- Plant Factor: 61.2%
- Total Annual Energy: 65.4 GWH
- Services Provided: Site identification & inception studies
Bakot Hydropower project
- Client / Developer: Private Sector
- Capacity: 3.8 MW
- Design Discharge: 30 Cumecs
- Net Head: 355 meter
- Plant Factor: 61.00%
- Total Annual Energy: 20.4 GWH
- Services Provided: Site identification & inception studies