Pearl Continental Hotel, Malam Jabba

  • Client: A JV of Hashoo & Samsons
  • Scope of Work:
  • Identification of water source, Detail Hydrology and sedimentation study meeting the requirements of 5 star hotel
  • Engineering, Procurement & Construction (EPC) of Water Supply Scheme (Gross head : ***) Flow:***l/s
  • 1300 m long MS Pipe
  • Installation of Imported Engineered Pumps
  • 1200 m long 11 kv embedded Transmission line
  • Installation of 100 kva step up and step down transformers
  • Installation of VFDs & control panels
  • Erection of Main Entrance Gate & Huts at the Malam Jabba Resort
  • Miscellaneous piping works for Hotel process equipment & HVAC