Expansion of Shakarganj Energy & Sugar Plant & Annual Maintenance Works
- Client: Shakaganj Energy PVT LTD.
- Scope of Work
- Fabrication, Installation & Supply of Venturi, Spreader air system, Over firing system, Bagasse feeding system, Chutes & Baffle in hopper.
- Duration: 45 days
- Material: A 36, SA 210
- Status: Completed
Expansion of Thal Industries Sugar Mill & Annual Maintenance Works 2017
- Client: Thal industries Corporation.
- Description: Supply & Service For Fabrication & Erection Supply & Service For Local Equipment’s Of Boiler Upgradation
- Duration: 45 days
- Material: A 36, SA 210
- Status: Completed
Al-Moiz Sugar Mill Annual Shutdown Works 2017-P1
- Client: Al-Moiz Sugar Mills
- Scope of Work
- Dismantling / Fabrication & Erection of Economizer Casing. Supply and installation of the scaffolding for safe working .The coils have to be removed from last side of economizer. Scaffolding should be strong enough for carrying the coils during removal. Crane for removal and installation of coils . Removal of insulation, casing & again reinstallation. Removal of coils. The connections with other tubes and headers needs to be made be proper. Installation new coils and welding with header and existing coils. 100% dye-penetrant examination of tube to tube and tube to header connections. Hydro test of economizer.
- Duration: 40 days
- Material: SA 210, A 36, A 516 Gr. 70
- Status: Completed
Al-Moiz Sugar Mills Annual Shutdown Works 2017-P2
- Client: Al-Moiz Industries Ltd.
- Scope of Work
- Supply Installation & Erection of boiler dry drum modification.
- Duration: 25 days
- Material: Hardox 400
- Status: Completed